Construction Update
Tile installation in the bathrooms has been completed. We are currently continuing with the walls plastering.
23 February 2026
Bricks on the first floor
We have finished the partition walls on the first floor and are continuing with the second floor.
17 November 2025

Bricks on the fourth floor and electrical work

We have finished the partition walls on the fourth floor and are continuing with the atico-floor (last floor). We started with the plumbing and electrical installations on the first floor.

Photo gallery

Comments

Add comment

Construction Update
Tile installation in the bathrooms has been completed. We are currently continuing with the walls plastering.
23 February 2026
Bricks on the first floor
We have finished the partition walls on the first floor and are continuing with the second floor.
17 November 2025
Contact
Point your camera at the QR code
qr barcode whatsapp
or follow the link
Continue in Browser
Point your camera at the QR code
qr barcode telegram
or follow the link
Continue in Browser