Bricks on the first floor
We have finished the partition walls on the first floor and are continuing with the second floor.
17 November 2025
T1 Construction Progress — July–August 2026
During July and August, construction works continue to progress as planned. We have started installing the ceramic cladding on the building’s facade, as well as the works for the rooftop swimming pool. Inside the apartments, we have begun the installation of the kitchens. We have also completed the ceramic tiling in the lift areas and the finishing works on the building’s staircases.
10 August 2026

Interior finishing

Floor tiling and ceiling installation in all apartments are mostly completed.

Photo gallery

Comments

Add comment

Bricks on the first floor
We have finished the partition walls on the first floor and are continuing with the second floor.
17 November 2025
T1 Construction Progress — July–August 2026
During July and August, construction works continue to progress as planned. We have started installing the ceramic cladding on the building’s facade, as well as the works for the rooftop swimming pool. Inside the apartments, we have begun the installation of the kitchens. We have also completed the ceramic tiling in the lift areas and the finishing works on the building’s staircases.
10 August 2026
Contact
Point your camera at the QR code
qr barcode whatsapp
or follow the link
Continue in Browser
Point your camera at the QR code
qr barcode telegram
or follow the link
Continue in Browser