Bricks on the third floor and electrical work
We have finished the partition walls on the second floor and are continuing with the third floor. We started with the plumbing and electrical installations on the first floor.
27 November 2025
We started laying bricks
We have already finished the structure, poured the roof pool and started to lay bricks on the first floor
23 October 2025

Bricks on the first floor

We have finished the partition walls on the first floor and are continuing with the second floor.

Photo gallery

Comments

Add comment

Bricks on the third floor and electrical work
We have finished the partition walls on the second floor and are continuing with the third floor. We started with the plumbing and electrical installations on the first floor.
27 November 2025
We started laying bricks
We have already finished the structure, poured the roof pool and started to lay bricks on the first floor
23 October 2025
Contact
Point your camera at the QR code
qr barcode whatsapp
or follow the link
Continue in Browser
Point your camera at the QR code
qr barcode telegram
or follow the link
Continue in Browser