Construction Update
Tile installation in the bathrooms has been completed. We are currently continuing with the walls plastering.
23 February 2026
Construction progress
Plastering works in stairwells and common areas of the building are in the final stage. In the apartments, wall tiling in bathrooms has been completed, and the installation of suspended ceilings in these areas is nearing completion. In addition, plumbing and sanitary installations in the bathrooms are in the final stage, leaving these areas prepared for the subsequent installation of sanitary fixtures. Terrace flooring works have also been carried out, with final finishing works currently in progress.
1 May 2026
Interior finishing
Floor tiling and ceiling installation in all apartments are mostly completed.
1 April 2026

Bricks on the first floor

We have finished the partition walls on the first floor and are continuing with the second floor.

Photo gallery

Comments

Add comment

Construction Update
Tile installation in the bathrooms has been completed. We are currently continuing with the walls plastering.
23 February 2026
Construction progress
Plastering works in stairwells and common areas of the building are in the final stage. In the apartments, wall tiling in bathrooms has been completed, and the installation of suspended ceilings in these areas is nearing completion. In addition, plumbing and sanitary installations in the bathrooms are in the final stage, leaving these areas prepared for the subsequent installation of sanitary fixtures. Terrace flooring works have also been carried out, with final finishing works currently in progress.
1 May 2026
Interior finishing
Floor tiling and ceiling installation in all apartments are mostly completed.
1 April 2026
Contact
Point your camera at the QR code
qr barcode whatsapp
or follow the link
Continue in Browser
Point your camera at the QR code
qr barcode telegram
or follow the link
Continue in Browser